Tsleem
EN — English
Log in Start free
For developers Unit handover v1.0 · available

Handover,
sealed.

Tsleem is the unit-handover workspace for developers and contractors in Egypt. Pin snags on the floor plan, inspect from site with no signal, and hand over every key with a bilingual report.

7-day free trial Cancel any time Arabic & English, full RTL
Drwg / Hero.01 Sheet 01 / 04 Scale · 1 : Project Sample sheet Sealed for handover
APT · 04-03 · 3-BED A101 · REV C 4.25 1.75 2.50 3.45 1.30 2.00 1.50 ENTRY closet laundry guest WC MASTER BED 24.4 m² ENSUITE 5.4 m² BED 2 14.2 m² HALL BATH KITCHEN 11.6 m² LIVING · DINING 28.0 m² 3 5 7 9 2 SIGNED N 0 2m 4m SCALE 1:50 LEVEL 04 · APT 04-03 3-BED · 84 M² · 5 OPEN TOWER B · ISSUED NOV 2026 SHEET 03 / 12
Open snag Signed off
02 → 03 Start → Method How the work runs 4 steps
Section · 03 / Method

Four steps from kick-off to keys.

Every project starts with the same structure — a sheet for the plans, a register for the crew, a stack of inspections, and a sealed report at the end. Set up once, repeat per tower.
Read the transcript

An apartment, a villa, or a whole building... It all comes down to one thing: the snag list.

Back at the office, the owner is following all of it alone. And the notes pour in from everywhere: chat groups, calls, voice notes, and paper all over the place. Which apartment? Which wall? Who's on it? And was it really fixed? Or just "all sorted, boss"?

The engineer on site knows one thing, the office knows another, and the client knows something else entirely. And the details? They fall through the cracks. Plus, on site... the signal keeps dropping.

That's why there's Tsleem. Every snag, on every plan, in one place.

The engineer opens the apartment's plan on her phone, and taps exactly where the problem is. Snaps a photo, adds a quick note. Picks the trade and the priority, and sends it to the right contractor. Done, it's logged.

And the whole team works on the same plan. The engineer logs and assigns, and each contractor sees only their own work. The office follows along and comments, and every move is recorded. And the client? Watches the work as it happens, without calling anyone.

Down in the basement with no signal? No problem. Keep working as usual, everything's saved on the phone. And once you're back online, one tap on Sync... and it all goes through.

The contractor fixes it and uploads an after photo. The engineer reviews it and closes the snag. And the owner? Sees every unit and every delay... while sipping his tea.

Track every unit's status, moment by moment. And when one is done... close it and hand it over, stress-free.

Tsleem... handover, without the headache. Try it free for seven days.

01 · Setup

Upload the plans

Add each floor plan from the dashboard. Images and PDFs both work, and every plan is named in Arabic and English.

02 · Crew

Invite the team

Add site managers, contractors and read-only clients. Contractors see only the work assigned to them, and every change is recorded against a name.

03 · Execution

Inspect from site

Tap the plan, drop a pin, photograph the snag, assign it. The app works with no signal and syncs when you are back in range.

04 · Handover

Hand over with the record

Walk the finished unit and hand over the keys. A bilingual PDF keeps every snag, its photos and its history as the record of what was delivered.

03 → 04 Method → Capability What is in the box 6 features
Section · 04 / Capability

Everything a handover needs. Nothing it does not.

Shipped · in every plan
Plans

A punch list on the floor plan

Tap the unit, drop a pin, photograph the snag. Every issue lives on the architectural plan rather than in a chat thread.

Offline

Works with no signal

Crews inspect in basements and unfinished towers. Everything syncs when the signal returns, with no edits lost.

Reports

Bilingual PDF report

One tap exports the handover file in Arabic or English, with the photos and the snag history attached.

Roles

Contractor / manager / client

Contractors see only their assigned issues. Site managers see the tower. Clients get a read-only view and nothing else.

Client

Clients follow along, free

Add your client to the project and they follow the job read-only in the mobile app. A client never takes a paid seat.

Evidence

Before and after photos

Each snag carries the photo that opened it and the photo that closed it, so the record survives the argument.

04 → 05 Capability → Plans What it costs 4 plans
Section · 05 / Plans

Priced per project. Monthly. No contracts.

EGP · Egypt 7-day free trial
Starter
One villa, a small fit-out, or a finishing crew working a single floor at a time.
1,000EGP
per project
/ month
team members 2
floor plans 2
storage 5 GB
PDF reports / day 1
custom fields 1
Professional
A normal residential building or interior fit-out — a project manager and a real site crew.
1,800EGP
per project
/ month
team members 6
floor plans 5
storage 20 GB
PDF reports / day 20
custom fields 3
Business
Mid-size towers, multi-floor handover, and daily inspections on a busy site.
3,800EGP
per project
/ month
team members 10
floor plans 12
storage 100 GB
PDF reports / day 50
custom fields 6
Enterprise
Developers, large contractors and consultants running a portfolio with specific needs.
Custom
Contact sales
team members ∞
floor plans ∞
storage ∞
PDF reports / day ∞
custom fields ∞
Section · 05b / Always included Every plan, every feature.
  • Offline-first mobile app
  • Bilingual interface — Arabic + English, full RTL
  • Snag pinning on the floor plan
  • Before / after photo capture
  • Bilingual PDF reports
  • Read-only client access in the app — no paid seat
  • Role-based permissions
  • Custom issue fields and statuses
  • Manual sync — you control the data usage
  • Encrypted in transit and at rest
Change plan at any time — new limits apply from the next billing cycle. 3-day grace period after the due date, with reminders by email, and your data is never deleted.
Pay by Bank transfer Instapay Vodafone Cash
05 → 06 Plans → Questions Asked by delivery managers 6 questions

Questions a delivery manager usually asks.

If yours is not here, we will answer it on a 20-minute call with a real handover file on screen.

Something else? Write to ebrahim.3bmo3ty@gmail.com and we will come back the same day.
01 Does it work in Arabic, right-to-left, end to end?

Yes. Every screen is bilingual — crews switch freely, and the exported PDF can be produced in Arabic or English. Numbers stay in Western digits (0–9) in both languages, so prices, dates and codes read the same.

02 What happens in a basement with no signal?

Inspections work fully offline. Photos, pins and edits are stored on the device and sync the moment the signal returns — you choose when to sync, so nobody burns their own data allowance by accident.

03 Do my contractors only see their own work?

Yes. A contractor sees the issues assigned to them and nothing else — not other trades, not the wider portfolio. Site managers see the whole project; clients follow it read-only in the app and take no paid seat.

04 Is there a free trial?

Seven days, no card required. You run a real project on it — upload real plans, inspect real units — rather than a sandbox.

05 How do I pay, and what if I pay late?

Monthly per project in EGP. You upload a payment proof and we confirm it. After the due date there is a 3-day grace period; past that the project turns read-only until payment clears. Nothing is deleted.

06 Is my data secure?

Encrypted in transit and at rest, with role-based access enforced on every project. Each project is isolated: a member of one project cannot reach another, and we do not sell or share your data.

06 → 07 Questions → Hand over Ship the keys 7-day trial

Ship the keys.
Keep the record.

Ninety seconds to open an account and upload a real plan. Run an inspection, generate a bilingual PDF, and hand over — the first 7 days are free.

7-day trial · cancel any time · no card required